week 51

week 51

Weather affected progress this week with Monday being unavailable for work with ice from the weekend. The elevator area was flooded from the rain and required a pump, some of that water frozen. This slowed further concrete work since site was not ready. Some progress...
Week 50

Week 50

Excavation work for the grand hallway! Admin Area (Zone B): The columbarium is now complete. Chapel Wing (Zone D): work/planning for collapsible walls and brickwork outside of the smaller fellowship hall. Restrooms on the west end are still...
Week 48

Week 48

Foundation walls and slab for elevator shaft are complete! Installation of concrete block walls has started. Chapel Wing (Zone D): Concrete poured for the ramp that leads from the vestibule to the Chapel. Restrooms on the west end are still...
weeks 45-47

weeks 45-47

Work has continued at a reasonable pace during December. Most of the current work is concrete cutters removing the old Sanctuary stairs, prepping the new ramp for concrete pour in Zone D, and prepping elevator area for concrete walls. Bathrooms in the Chapel hallway...