Construction is moving forward! The “sunroom” connector between the Admin building and the Sanctuary has been removed. This is the future location of the elevator and new stairwell to the second floor of the administrative offices.
In addition, they have started framing the offices on both floors of the administrative building. The second floor will look significantly different. Much more open. The Fowler Conference Room, which is currently being framed to create 3 office spaces, will get a new home during construction.
Our contractor has verified that the Sanctuary will be usable until at least Easter. After Easter they will make updates to the Chancel and choir area, which we hope will move quickly. Both services will be in Barron Hall during that time.
We are working hard to prepare for Christmas. Please excuse our mess while we attempt to showcase the beauty of this church amidst construction. We are aware that parking will be an issue, particularly for Christmas and Easter. It is on our scope to address.
Merry Christmas!