Zone B: Walls ready for final coat of paint, casework/cabinetry installed on upper and lower levels (see picture), as well as mason work on dormers. Hopefully staff will move within a month!
Zone D: work on new sewer line from basement to the city system; concrete cutting solutions for foundation footing preparation; repairs to gutter system near ramp room; downspout drain area digging and re-routing for drainage issues.
Sanctuary: Concrete prep outside the porte cohere entrance; some concrete has been poured. Both worship services are being held in Barron Hall.