This has been a successful and busy week for construction efforts with lots of work completed in Zone B and Zone D. In Zone B, insulation and sheetrock have been installed in much of the second floor. HVAC teams also started work on rehanging the venting. Finally, concrete crews prepped the covered walkway between Zone B and Barron Hall for new concrete pour, scheduled for Monday.
In Zone D, the ground has been prepared to allow for concrete pour on Monday to complete the footings for the new fellowship hall (see picture).
The architect confirmed with Facilities team the colors for cabinets and casework. The columbarium doors have been removed to allow for work in doubling the amount of niches available.